QUALITY ASSURANCE

What you approved
is what you receive.

Six controls between your approval and your delivery. Each one leaves a record, and the last one comes to you as a report before anything ships.

SAMPLE · INSPECTION REPORTQA-0000 · Rev. A

Pre-shipment inspection

PROJECTSample project
ORDER LINES3 of 3 checked
INSPECTORQA and QC team
Inspection Photo 01PHOTO 01
Inspection Photo 02PHOTO 02
Inspection Video 01
VIDEO 01
01Dimensions against approved drawing
✓ Pass
02Finish and colour against approved sample
✓ Pass
03Hardware, seals and operation
✓ Pass
04Packing, labels and quantities
✓ Pass
Result: Released for shipping
Sent to client before dispatch
01

Written approval

Drawings, schedules and samples signed off by you before production starts.

02

Vetted factory

Each order goes to a factory we have checked for the product, the standard and the volume.

03

Materials check

Profiles, glass, hardware and finishes checked against the approved spec.

04

In-production check

Dimensions, finishes and assembly verified while the order is made.

05

Pre-shipment inspection

Photo and video report tied to each line of the order, issued before shipping.

06

Packing and loading

Crating, labels and quantities recorded as the order is loaded.

FACTORY VISITS

See it being made.

We arrange a scheduled factory visit on qualified orders or BOQs, so you can walk the line and meet the team building your order.

STANDARDS · NORTH AMERICA

Sourced to the standard you build to.

Products sourced to NFRC, UL, CSA or Energy Star as your project requires.

NFRCULCSAENERGY STAR
Matryvo factory production line
FACTORY FLOOR

Not a showroom.Not a marketplace.A direct line to the factories.

Metal stock on a factory production line
01Production line
Made to your approved specs
Checking the dimensions of a seal with a digital caliper
02In-production check
QA and QC
Loading and dispatch container
03Loading and dispatch
Logistics and documentation